ECO-Norit Activated Carbon Pte Ltd
Was incorporated in Singapore on the 6th July 2018, with ECO IEE holding 65% shares and Norit Netherland B.V holding 35% shares.
</ul
In the multi hearth furnace, spent carbon is dropped off on the first bed and swept by the rake teeth, forming a mountain-like shape, to maximize contact area between the spent carbon and steam. The spent carbon will be dried and reactivated with steam.
3 stages within Multi hearth furnace